Amazon cover image
Image from Amazon.com

Surveying for construction / William Irvine.

By: Publication details: London ; New York : McGraw-Hill Book Co., c1980.Edition: 5th editionDescription: viii, 283 p. : ill. ; 28 cmISBN:
  • 0077111141
  • 9780077111144
Subject(s): DDC classification:
  • 526.9 22 IRV
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Book Closed Access Book Closed Access Engineering Library 526.9/024624 IRV 1 (Browse shelf(Opens below)) 1 Available BUML23080031
Book Closed Access Book Closed Access Engineering Library 526.9 IRV 2 (Browse shelf(Opens below)) 2 Available BUML23080046
Book Closed Access Book Closed Access Engineering Library 526.9 IRV 3 (Browse shelf(Opens below)) 3 Available BUML23080019
Book Closed Access Book Closed Access Engineering Library 526.9 IRV 4 (Browse shelf(Opens below)) 4 Available BUML23080020
Book Closed Access Book Closed Access Engineering Library 526.9 IRV 5 (Browse shelf(Opens below)) 5 Available BUML23080018


CONTENT

Chapter 1 Surveying fundamental.
1. Accuracy of surveying quantities.
2. Units of measurement.
3. Understanding scale
4. Drawing to scale.
Etc

CHAPTER 2 Understanding maps and plans.
1. Site plans
2. Ordnance survey maps and plans
3. Answers.

CHAPTER 3 Linear surveying
1. Principles of linear surveying
2. Linear measuring techniques.
3. Procedure in linear survey
4. Plotting the survey
5. Answer.

CHAPTER 4 Levelling
1 .Levelling instruments.
2. Observation of levels (rise and fall method)
3. Reduction of levels by the height of plane.
4. Reduction of levels by the height of plane.
Etc.

CHAPTER 5.
1. Contour characteristics.
2. Methods of contouring
3. Uses of contour plans
4. Answers

CHPTER 6 Vertical sections.
1. Development plan
2. longitudinal sections
3. Cross section.
4. Computer generation sections
Answer.

CHAPTER 7 Theodolites and total stations.
Theodolites
1. Classification
2. Principles of construction
3. Reading the circles
4. setting up the theodolite.

CHAPTER 8 Traverse survey
1. Types of traverse
2. Basic principles of traversing
3. Fieldwork.
4 Traverse calculations.
Etc

CHAPTER 9 Global positioning system GPS
1. Principle of GPS
2. Errors in GPS
3. Differential GPS (DGPS)
4. GPS Procedures
Etc.
CHAPTER Detail survey
1. Principles of radial positioning
2. Calculation and plotting of survey (manually)
3. Calculation plotting using microcomputer based mapping systems.
4. Radial survey with automatic total station.
Etc

CHAPTER II Curve ranging
1. curve geometry
2. curve elements
3. Designation of curves.
4. problems in curve location
Etc

CHAPTER 12 Setting out construction works.
1. setting out - Principles
2. Equipment for setting out.
3. setting out a pegs on a specified distance and bearing.
4. setting out roadways calculations.
Etc.

CHAPTER 13.
1. Regular areas
2. Irregular areas
3. Areas from field notes
4. Measuring areas from plans.
5. Answers.

CHAPTER14 Mensuration Volumes.
1. cuttings (with vertical sides)
2. General rule for calculation volume
3. cuttings and embankments (with slopping sides)
4. calculation of cross sections areas
Etc

CHAPTER 15 Surveying of existing buildings.
1. classification of drawing
2. Principles of measurement
3. conducting the survey
4 surveying higher rise building
Etc



Includes bibliographical references and index.

There are no comments on this title.

to post a comment.