Structure, power, and results : (Record no. 4646)

MARC details
000 -LEADER
fixed length control field 01709nam a2200229 i 4500
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20240209133217.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 750623s1975 ilu b 001 0 eng
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 0870940937
040 ## - CATALOGING SOURCE
Original cataloging agency BUL
Transcribing agency BUL
Modifying agency BUL
Language of cataloging eng
Description conventions rda
082 00 - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 658.4
Edition number 23
Item number MAH
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Mahler, Walter Robert.
245 10 - TITLE STATEMENT
Title Structure, power, and results :
Remainder of title how to organize your company for optimum performance /
Statement of responsibility, etc. Walter R. Mahler.
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Homewood, Ill. :
Name of publisher, distributor, etc. Dow Jones-Irwin,
Date of publication, distribution, etc. 1975.
300 ## - PHYSICAL DESCRIPTION
Extent xii, 247 p. :
Other physical details ill. ;
Dimensions 24 cm.
500 ## - GENERAL NOTE
General note Contents;<br/><br/>Part one: Introduction<br/>1. A behavioral emphasis to organization planning <br/>2. A process approach to organization planning <br/><br/>Part two: Structure <br/>3. A process for analyzing an existing structure <br/>4. Structural benefits <br/>5. Case study <br/>6. Designing a new structure <br/>7. Structural alternatives <br/>8. An additional case of structure planning <br/><br/>Part three: Power<br/>9. Analyzing power problems <br/>10. Managing power <br/><br/>Part four: Job design <br/>11. Analyzing position definition difficulties in an established organization <br/>12. A process for position design <br/><br/>Part five: Staffing <br/>13. Processes for resolving staff questions in an existing organization <br/>14. A process for arriving at staffing decisions <br/><br/>Part six: Follow-through <br/>15. Implementation <br/>16. Assessment <br/><br/>Part seven: Special issues <br/>17. Organization planning at the chief executive level <br/>18. Stages in the evolution of organization in the construction industry <br/><br/>
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 239-242 . _ Index : p. 245-247.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Management.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Organization.
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Book Open Access
Classification part 658.4
Item part 1
Call number prefix MAH
Call number suffix 658.4 MAH
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Date acquired Source of acquisition Inventory number Total Checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
    Dewey Decimal Classification     Engineering Library Engineering Library 07/01/2021 Donation 0021152   658.4 MAH 1 BUML24020452 07/01/2021 1 07/01/2021 Book Open Access