An electric-pole tilt notification system/ (Record no. 14430)

MARC details
000 -LEADER
fixed length control field 08100nam a22002297a 4500
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20220721134043.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 220721b ||||| |||| 00| 0 eng d
040 ## - CATALOGING SOURCE
Original cataloging agency BUL
Language of cataloging ENG
Transcribing agency BUL
Modifying agency BUL
Description conventions RDA
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Kenneth,Tugume.
Dates associated with a name 2016
245 ## - TITLE STATEMENT
Title An electric-pole tilt notification system/
Statement of responsibility, etc. Tugume, Kenneth.
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Busitema University:
Name of publisher, distributor, etc. Busitema University;
Date of publication, distribution, etc. 2016
300 ## - PHYSICAL DESCRIPTION
Extent x,
Other physical details Col.ill.,
Dimensions 30 cm
500 ## - GENERAL NOTE
General note CHAPTER ONE................................................................................................................. 1<br/>INTRODUCTION .............................................................................................................. 1<br/>1.1 BACKGROUND.................................................................................................. 1<br/>1.2 PROBLEM STATEMENT....................................................................................... 2<br/>1.3 OBJECTIVES........................................................................................................... 3<br/>1.3.2 Specific Objectives. ............................................................................................3<br/>1.4 JUSTIFICATION. .................................................................................................... 3<br/>1.5 Scope......................................................................................................................... 3<br/>CHAPTER TWO ................................................................................................................ 4<br/>LITERATURE REVIEW ................................................................................................... 4<br/>2.0 INTRODUCTION .................................................................................................... 4<br/>2.1 DEFINITIONS, DESCRIPTIONS AND CONCEPTS ............................................ 4<br/>2.1.1 RF Transmitter/Receiver pair .............................................................................4<br/>2.1.2 GSM technology. ................................................................................................4<br/>2.1.3 Database System.................................................................................................4<br/>2.1.4 The accelerometer sensor....................................................................................5<br/>2.1.5 Microcontroller. ..................................................................................................5<br/>2.2 THE EXISTING TILT DETECTION SYSTEMS. .................................................. 5<br/>2.2.1 Vibration Monitoring of Power Distribution Poles. ...........................................5<br/>2.2.2 Electrical & Mechanical Fault Alert Traffic Light System Using Wireless<br/>Technology. .................................................................................................................7<br/>2.4 COMPARISON BETWEEN THE NEW AND THE EXISTING SYSTEM......... 10<br/>2.5 TECHNOLOGIES USED....................................................................................... 10<br/>CHAPTER THREE .......................................................................................................... 11<br/>viii<br/>METHODOLOGY ........................................................................................................... 11<br/>3.0 INTRODUCTION .................................................................................................. 11<br/>3.1 DATA COLLECTION AND ANALYSIS............................................................. 11<br/>3.1.1 Requirement elicitation.....................................................................................11<br/>3.2 REQUIREMENTS ANALYSIS............................................................................. 12<br/>3.3 SYSTEM DESIGN. ................................................................................................ 12<br/>3.3.1 Design tools. .....................................................................................................12<br/>3.4 SYSTEM IMPLEMENTATION. ........................................................................... 13<br/>CHAPTER FOUR............................................................................................................. 14<br/>SYSTEM ANALYSIS AND DESIGN............................................................................. 14<br/>4.0 INTRODUCTION .................................................................................................. 14<br/>4.1 REQUIREMENTS ANALYSIS............................................................................. 14<br/>4.1.1 Functional Requirements. .................................................................................14<br/>4.1.2 Non-Functional Requirements..........................................................................14<br/>4.2 SYSTEM DESIGN. ................................................................................................ 15<br/>4.2.1 Logic design......................................................................................................16<br/>4.2.2 Conceptual design.............................................................................................16<br/>4.3 SYSTEM DEVELOPMENT;................................................................................. 20<br/>4.3.1 The Development Platform...............................................................................20<br/>4.3.2 Code design of the system ................................................................................20<br/>4.3.3 The circuit diagram for the system ...................................................................23<br/>4.3.4 The system operation ........................................................................................23<br/>CHAPTER FIVE .............................................................................................................. 24<br/>IMPLEMENTATION AND TESTING ........................................................................... 24<br/>5.1 SYSTEM IMPLEMENTATION............................................................................ 24<br/>5.2 SYSTEM TESTING ............................................................................................... 24<br/>5.2.1 Unit testing........................................................................................................24<br/>5.2.2 Integration testing. ............................................................................................25<br/>5.2.3 System testing ...................................................................................................26<br/>5.2.4 Validation of the system ...................................................................................... 26<br/>5.2.5 Verification .......................................................................................................... 26<br/>ix<br/>CHAPTER SIX................................................................................................................. 28<br/>DISCUSSIONS AND RECOMMENDATION................................................................ 28<br/>6.0 INTRODUCTION. ................................................................................................. 28<br/>6.1 DISCUSSION OF THE ACHIEVEMENTS OF THE SYSTEM. ......................... 28<br/>6.2 CHALLENGES FACED. ....................................................................................... 28<br/>6.3 RECOMMENDATIONS FOR FUTURE WORK. ................................................ 29<br/>6.4 CONCLUSION....................................................................................................... 29<br/>REFERENCES ................................................................................................................. 30<br/>APPENDIX....................................................................................................................... 31
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Includes appendix
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element System design
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Electric pole
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Remote areas
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Notification systems
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Tugume, Kenneth/
Dates associated with a name 2016
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Book Reference
Item part 1
Call number prefix 621.319072
Call number suffix TUG
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Date acquired Source of acquisition Total Checkouts Barcode Date last seen Copy number Uniform Resource Identifier Price effective from Koha item type
    Dewey Decimal Classification     Engineering Library Engineering Library 07/21/2022 Donation   BUML22075824 07/21/2022 1 http://hdl.handle.net/20.500.12283/1210 07/21/2022 Book Reference