Design and simulation of a mini hydropower scheme for Bushika sub county in Bududa District / (Record no. 14376)
[ view plain ]
000 -LEADER | |
---|---|
fixed length control field | 03163nam a22002297a 4500 |
003 - CONTROL NUMBER IDENTIFIER | |
control field | OSt |
005 - DATE AND TIME OF LATEST TRANSACTION | |
control field | 20220719093134.0 |
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
fixed length control field | 220719b ||||| |||| 00| 0 eng d |
028 ## - PUBLISHER OR DISTRIBUTOR NUMBER | |
Source | BUL |
040 ## - CATALOGING SOURCE | |
Original cataloging agency | BUL |
Language of cataloging | eng |
Transcribing agency | BUL |
Modifying agency | BUL |
Description conventions | rda |
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER | |
Edition number | 22 |
Classification number | 333.914072 |
Item number | KAS |
100 ## - MAIN ENTRY--PERSONAL NAME | |
Personal name | Kasakya, Ndimulodi |
245 ## - TITLE STATEMENT | |
Title | Design and simulation of a mini hydropower scheme for Bushika sub county in Bududa District / |
Statement of responsibility, etc. | Ndimulodi Kasakya. |
260 ## - PUBLICATION, DISTRIBUTION, ETC. | |
Place of publication, distribution, etc. | Busitema University : |
Name of publisher, distributor, etc. | Busitema University, |
Date of publication, distribution, etc. | 2018 |
300 ## - PHYSICAL DESCRIPTION | |
Extent | xi, 65 p. : |
Other physical details | col. ill. ; |
Dimensions | 30 cm |
500 ## - GENERAL NOTE | |
General note | CHAPTER .ONE <br/>1.0 Introduction <br/>1.1BACK GROUNO.<br/>1.2 PROBLEM STATEMENT<br/>1.3 JUSTIFICATION <br/>1.4 PURPOSE Of THE STUDY <br/>1,5 ·OBJECTIVES OF THE·PROJECT <br/>1.>.1 Main objective <br/>1.5.2 Specific Objectives <br/>1.6 SCOPE OF THE STU D.Y <br/>CHAPTER TWO 5<br/>~.LITERATURE·REVIEW <br/>2.1·Site Configurations <br/>·2,2 Run-of-river scheme<br/>2.3 Planning a small hydro-Power scheme at river Mungoni , <br/>2.4 Hydraulic structures (civil structures) <br/>·2:5 Hydraulic losses in hydro power scheme! <br/>2.6 Evaluating stream fl.ow <br/>2.6.:1.Stream ·flow records<br/>2 ..6,2 Stream Flow Characteristics<br/>2.6.3 Flow Duration Curves ..(FDC)<br/>2.6.4 Evaluation of gross head <br/>2:6.5· Estimation of net head <br/>.2•.7 Hydraulic turbines <br/>2.7.1 Types of turbines used in hydro power scheme<br/>2.7.2 Turbine selection criteria <br/>2.7.3. Discharging<br/>:2.7.4 Cavitation<br/>·.2;7.5.Turbine efficiency <br/>.z.a Generator <br/>2.$,1 Speed Governors-and controls<br/>2.S.2· Electronic load governors <br/>2.8.~ Emergency system shut down <br/>CHAPTER THREE <br/>3.0 METHODOLOGY <br/>3.1 Methods of data collection <br/>3.2 Materials and equipment.<br/>3.3 Identification of potential site location<br/>3;4' Determination of.head <br/>3.5 Methodology for Specific objective two:<br/>~.S.l Designing of the different components of the system<br/>:1.5.2 Design of 'civil components<br/>3.5.3. Design of the mechanical component <br/>3.5.4 Turbine speed <br/>3.5.5 Design of the Kaplan turbine <br/>·3.6' Methodology for specific objective<br/>3.6.1 Simulation of the' project <br/>3.7 Methodology for specific objective four <br/>CHAPTER FOUR <br/>4.1 RESULTS AND DISCUSSIONS·<br/>4.2 'Power demand of the project area <br/>4.2.1 House hold power demand<br/>4.2.2 Institutional Power Demand <br/>4.2.3 Commercial /.Industrial Power Demand.<br/>4.2:3.1 Commercial Power Demand<br/>43·Base load <br/>4.4 Peak.demand <br/>4.5 Design of the civil components <br/>4.5:1 Design of the diversion intake <br/>4.5.2 Design of the head-race canal <br/>4.5.3 Design of the spillway <br/>4;5.4 Design of the settling basin<br/>4.5.5 Design of the·.fore bay tank <br/>4.5.6 Sizing of-the turbine <br/>4.5.7 Generator System sizing <br/>4.:5 Test and validation of the system<br/>4,6 Econornlc -analysis <br/>4.6.1 Capital costs <br/>4.6.2 Power generation costs <br/>4.6.3· Benefits· from the scheme <br/>4.6.4 Annual income from the power demand facilities <br/>·CHAPTER·FIVE<br/>5.1 CONCLUSION AND RECOMMENDATION <br/>5;2 CONCLUSION <br/>5.3 Recommendations<br/> |
504 ## - BIBLIOGRAPHY, ETC. NOTE | |
Bibliography, etc. note | Includes index and references |
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical term or geographic name entry element | Hydro power scheme |
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM | |
Topical term or geographic name entry element | Water resources |
856 ## - ELECTRONIC LOCATION AND ACCESS | |
Uniform Resource Identifier | <a href=" http://hdl.handle.net/20.500.12283/1811"> http://hdl.handle.net/20.500.12283/1811</a> |
942 ## - ADDED ENTRY ELEMENTS (KOHA) | |
Source of classification or shelving scheme | Dewey Decimal Classification |
Koha item type | Book Reference |
Item part | 1 |
Call number prefix | 333.914072 |
Call number suffix | KAS |
Withdrawn status | Lost status | Source of classification or shelving scheme | Damaged status | Not for loan | Home library | Current library | Date acquired | Source of acquisition | Total Checkouts | Full call number | Barcode | Date last seen | Copy number | Uniform Resource Identifier | Price effective from | Koha item type |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Dewey Decimal Classification | Engineering Library | Engineering Library | 07/19/2022 | Donation | 333.914072 KAS | BUML22075811 | 07/19/2022 | 1 | http://hdl.handle.net/20.500.12283/1811 | 07/19/2022 | Book Reference |