Design and simulation of a mini hydropower scheme for Bushika sub county in Bududa District / (Record no. 14376)

MARC details
000 -LEADER
fixed length control field 03163nam a22002297a 4500
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20220719093134.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 220719b ||||| |||| 00| 0 eng d
028 ## - PUBLISHER OR DISTRIBUTOR NUMBER
Source BUL
040 ## - CATALOGING SOURCE
Original cataloging agency BUL
Language of cataloging eng
Transcribing agency BUL
Modifying agency BUL
Description conventions rda
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Edition number 22
Classification number 333.914072
Item number KAS
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Kasakya, Ndimulodi
245 ## - TITLE STATEMENT
Title Design and simulation of a mini hydropower scheme for Bushika sub county in Bududa District /
Statement of responsibility, etc. Ndimulodi Kasakya.
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Busitema University :
Name of publisher, distributor, etc. Busitema University,
Date of publication, distribution, etc. 2018
300 ## - PHYSICAL DESCRIPTION
Extent xi, 65 p. :
Other physical details col. ill. ;
Dimensions 30 cm
500 ## - GENERAL NOTE
General note CHAPTER .ONE <br/>1.0 Introduction <br/>1.1BACK GROUNO.<br/>1.2 PROBLEM STATEMENT<br/>1.3 JUSTIFICATION <br/>1.4 PURPOSE Of THE STUDY <br/>1,5 ·OBJECTIVES OF THE·PROJECT <br/>1.>.1 Main objective <br/>1.5.2 Specific Objectives <br/>1.6 SCOPE OF THE STU D.Y <br/>CHAPTER TWO 5<br/>~.LITERATURE·REVIEW <br/>2.1·Site Configurations <br/>·2,2 Run-of-river scheme<br/>2.3 Planning a small hydro-Power scheme at river Mungoni , <br/>2.4 Hydraulic structures (civil structures) <br/>·2:5 Hydraulic losses in hydro power scheme! <br/>2.6 Evaluating stream fl.ow <br/>2.6.:1.Stream ·flow records<br/>2 ..6,2 Stream Flow Characteristics<br/>2.6.3 Flow Duration Curves ..(FDC)<br/>2.6.4 Evaluation of gross head <br/>2:6.5· Estimation of net head <br/>.2•.7 Hydraulic turbines <br/>2.7.1 Types of turbines used in hydro power scheme<br/>2.7.2 Turbine selection criteria <br/>2.7.3. Discharging<br/>:2.7.4 Cavitation<br/>·.2;7.5.Turbine efficiency <br/>.z.a Generator <br/>2.$,1 Speed Governors-and controls<br/>2.S.2· Electronic load governors <br/>2.8.~ Emergency system shut down <br/>CHAPTER THREE <br/>3.0 METHODOLOGY <br/>3.1 Methods of data collection <br/>3.2 Materials and equipment.<br/>3.3 Identification of potential site location<br/>3;4' Determination of.head <br/>3.5 Methodology for Specific objective two:<br/>~.S.l Designing of the different components of the system<br/>:1.5.2 Design of 'civil components<br/>3.5.3. Design of the mechanical component <br/>3.5.4 Turbine speed <br/>3.5.5 Design of the Kaplan turbine <br/>·3.6' Methodology for specific objective<br/>3.6.1 Simulation of the' project <br/>3.7 Methodology for specific objective four <br/>CHAPTER FOUR <br/>4.1 RESULTS AND DISCUSSIONS·<br/>4.2 'Power demand of the project area <br/>4.2.1 House hold power demand<br/>4.2.2 Institutional Power Demand <br/>4.2.3 Commercial /.Industrial Power Demand.<br/>4.2:3.1 Commercial Power Demand<br/>43·Base load <br/>4.4 Peak.demand <br/>4.5 Design of the civil components <br/>4.5:1 Design of the diversion intake <br/>4.5.2 Design of the head-race canal <br/>4.5.3 Design of the spillway <br/>4;5.4 Design of the settling basin<br/>4.5.5 Design of the·.fore bay tank <br/>4.5.6 Sizing of-the turbine <br/>4.5.7 Generator System sizing <br/>4.:5 Test and validation of the system<br/>4,6 Econornlc -analysis <br/>4.6.1 Capital costs <br/>4.6.2 Power generation costs <br/>4.6.3· Benefits· from the scheme <br/>4.6.4 Annual income from the power demand facilities <br/>·CHAPTER·FIVE<br/>5.1 CONCLUSION AND RECOMMENDATION <br/>5;2 CONCLUSION <br/>5.3 Recommendations<br/>
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Includes index and references
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Hydro power scheme
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Water resources
856 ## - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href=" http://hdl.handle.net/20.500.12283/1811"> http://hdl.handle.net/20.500.12283/1811</a>
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Book Reference
Item part 1
Call number prefix 333.914072
Call number suffix KAS
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Date acquired Source of acquisition Total Checkouts Full call number Barcode Date last seen Copy number Uniform Resource Identifier Price effective from Koha item type
    Dewey Decimal Classification     Engineering Library Engineering Library 07/19/2022 Donation   333.914072 KAS BUML22075811 07/19/2022 1 http://hdl.handle.net/20.500.12283/1811 07/19/2022 Book Reference