000 03082cam a2200313 a 4500
999 _c379
_d379
001 15499639
003 OSt
005 20210128125015.0
008 081027s2009 ne a b 001 0 eng
010 _a 2008046910
020 _a9780123708953
020 _a0123708958
040 _aBUL
_cBUL
_dBUL
_bENG
_eRDA
082 0 0 _a622.2281
_222
_bAIR
245 0 0 _aAir and gas drilling manual /
_cWilliam C. Lyons ... [et al.].
250 _a3rd edition.
260 _aAmsterdam ;
_aBoston :
_bELSEVIER
_cc2009.
300 _aXii, (Various pgs). :
_bill. ;
_c25 cm.
500 _aIntroduction and units 1.1 Objective and terminology 1.2 Engineering calculations and units -- Air and gas versus mud 2.1 Rotary drilling 2.2 Circulation systems 2.3 Comparison of mud and air drilling -- Surface equipment -- Downhole equipment 3.1 Drilling location 3.2 Flow line to the rig 3.3 Wellhead equipment 3.4 Flow line from rig Downhole Equipment 4.1 Rotary drill string 4.2 Drill bits 4.3 Bottom hole assembly 4.4 Drill pipe 5.4 Safety Equipment 4.6 Drill string design -- Compressors and nitrogen generators 5.1 Compressor classification 5.2 Standard units 5.3 Continuous flow (dynamic ) compressor etc -- Direct circulation models 6.1 Basic assumption 6.2 General derivation 6.3 Aerated fluid drilling model etc -- Reverse circulation models 7.1 Basic assumption 7.2 General derivation 7.3 Aerated fluid drilling model 7.4 Stable foam drilling model 7.5 Air and gas drilling model -- Air, gas and unstable foam drilling 8.1 Deep well planning 8.2 Minimum volumetric flow rate and compressor selection 8.3 Bottom hole and injection pressure 8.4 Water injection and formation water influx 8.5 Prime mover fuel consumption 8.6 Conclusion -- Aerated fluids drilling 9.1 Deep well drilling planning 9.2 Aerated fluids drilling operation 9.3 Minimum volumetric flow rates 9.4 Non friction and friction illustrative example 9.5 Conclusion -- Stable foam drilling 10.1 Stable foam rheology 10.2 Deep well drilling planning 10.3 Stable foam drilling operations 10.4 Minimum volumetric flow rates 10.5 Nonfiction and friction illustratrative example 10.6 Conclusion -- Specialized downhole drilling equipment 11.1 DTM 11.2 PDM 11.3 Conclusion -- Underbalanced drilling. 12. 1 Introduction 12.2 Vertical wells 12.3 Directional wells 12.4 Conclusion
504 _aIncludes bibliographical references and index
650 0 _aAir drilling (Petroleum engineering)
650 0 _aGas drilling (Petroleum engineering)
700 1 _aLyons, William C.
700 1 _aLyons, William C.
_tAir and gas drilling manual
856 4 2 _3Publisher description
_uhttp://www.loc.gov/catdir/enhancements/fy0904/2008046910-d.html
906 _a7
_bcbc
_corignew
_d1
_eecip
_f20
_gy-gencatlg
942 _2ddc
_cBO
_h622.2281
_i1
_kAIR
_m622.2281 AIR
_e3rd edition